MultiQuickConnector is Lindner’s new product for the easy connection of heated/chilled ceilings to newly-built as well as existing constructions. The positive-locking quick plug connector does without retaining claws which unnecessarily damage the meanders.
The Lindner Group convinced the general public. Having handled a lot of projects in the Middle East successfully, the company demonstrated its competences with the Burj Qatar in Doha. With NORTEC raised floor system Lindner delivered a proven remedy to equip about 45,000 square metres of the 60,000-square-metre area.
After an auspicious financial year 2011 and another good start in 2012, the Lindner Group continues its success story: The expert for interior fit-out from Lower Bavaria was elected to be company of the Month.
The comprehensive modernisation and renovation of Germany’s once highest building (159 metres) was completed by the end of 2010. Hundreds of tons of waste materials had to be disposed of in the course of the energy renovation and architectural redesign of the building.