KELOWNA, BRITISH COLUMBIA — (Marketwire) — 02/15/12 — Fission Energy Corp. ("Fission or "the Company") (TSX VENTURE: FIS)(OTCQX: FSSIF) and its 50% Joint Venture (JV) partner ESO Uranium Corp., announce that six new claims totalling approx. 8,170 hectares (20,200 acres) have been staked along the south boundary of the PLS Property. The new staking has increased the size of the PLS Property to approximately 31,039 hectares in 17 mineral claims.The six new claims were staked to
KELOWNA, BRITISH COLUMBIA — (Marketwire) — 02/07/12 — FISSION ENERGY CORP. ("Fission" or the "Company") (TSX VENTURE: FIS)(OTCQX: FSSIF) is pleased to announce the launch of a social media program to help investors, analysts and other interested parties stay up to date with news and updates from Fission. The program will include Twitter and YouTube, in addition to a CEO-s Corner on the Company-s website.Fission on Twitter: Anyone interested in real-time updates via Twitt
KELOWNA, BRITISH COLUMBIA — (Marketwire) — 08/18/11 — FISSION ENERGY CORP. ("Fission" or "the Company") (TSX VENTURE: FIS)(OTCQX: FSSIF) is pleased to announce that a C$1.2 Million, 2,000m summer drill program has commenced at its 100% owned Dieter Lake Property in northern Quebec. The drill program plans to test an area east of Vivian Lake, where historical drilling yielded consistent, and relatively high-grade intercepts, ranging from approximately 400 to 3,700 ppm U3O
KELOWNA, BRITISH COLUMBIA — (Marketwire) — 07/27/11 — Fission Energy Corp (TSX VENTURE: FIS)(OTCQX: FSSIF) ("Fission" or "the Company"), and its 50% Joint Venture (JV) partner, ESO Uranium Corp.(TSX VENTURE: ESO), announce results from its boulder prospecting and radon survey program. A total of seventy-four (74) boulder and mineralized soil samples were submitted for assay with the boulders ranging in size from gravel material to mineralized cobbles and boulders up to 4
KELOWNA, BRITISH COLUMBIA — (Marketwire) — 07/26/11 — FISSION ENERGY CORP. ("Fission" or the "Company") (TSX VENTURE: FIS)(OTCQX: FSSIF) and its Limited Partner, the Korea Waterbury Uranium Limited Partnership ("the Waterbury Consortium"), announce the final assay results from their Waterbury Lake 2011 winter program. A total of 26,305m were completed in eighty-two holes, of which fifty-three holes were completed in the high grade J Zone uranium deposit. Ten ho