back to homepage

Tag "eagle-star-minerals-corp"

Eagle Star Minerals Concludes Detailed Mapping at Canabrava, Doubles Mineralized Strike to 30 Kilometers and Claims New Areas 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 12/12/12 — Eagle Star Minerals Corp. (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is pleased to announce it has been successful in claiming additional areas to the north portion of its Canabrava block where the company has identified though detailed mapping an extension of the 15 km mineralized package previously announced (July 25th, 2012). The mineralized package now extends over 30 k

Read More

Eagle Star Expands Bomfim Claims Along Phosphate Belt Based on Positive Drill and Pit Sampling Results 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 12/11/12 — Eagle Star Minerals Corp., (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is pleased to announce that it has acquired exploration rights to an additional 59,654 hectares in close proximity to its Bomfim Agro Mineral Project, located 10km from the MbAC-s Itafos Mine. The new areas are distributed along what is considered to be the new phosphate belt in central Brazil, and where

Read More

Eagle Star Minerals Receives More Excellent Pit Results and Expands Lateral Continuity of the High-Grade Zone at the Bomfim Hill, Which Remains Open in All Directions 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 12/10/12 — Eagle Star Minerals Corp., (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is pleased to announce excellent results from Pits 3 and 4 returning 15.42% P2O5 over 5 meters and 23% P2O5 over 1.5m average grade respectively. Both pits terminated in high-grade phosphorite and remain open at depth. The XRF results for the four pits excavated to date confirm that the high grade zone at

Read More

Eagle Star Intersects Additional High Grade Phosphate in Pit 2 Averaging 19% Over 4.5 Meters (Still Open at Depth) and Confirms Lateral Continuity at Bomfim 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 11/29/12 — Eagle Star Minerals Corp. (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is very pleased to announce additional excellent results from test pits at Bomfim (Block D1) that confirm the lateral continuity of the high grade zone. Pit 2, located 140 meters from Pit 1 has returned an average P2O5 grade of 19% and remains open at depth further supporting the observation (based on deta

Read More

Eagle Star Minerals Intersects 5 Meters of High Grade Phosphate From Surface Averaging 22% P2O5 Which Remains Open in Depth at Bomfim 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 11/27/12 — Eagle Star Minerals Corp. (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is pleased to announce excellent results of a 5 meter interval averaging 22% P2O5 within a pit opened at the Bomfim Hill (Target D1). Detailed mapping completed at a 1:10,000 scale has revealed that this mineralized package consists of a high grade phosphorite layer which appears to extend over an area of

Read More

Eagle Star Minerals Completes Oversubscribed Private Placement and Contracts Drilling Company 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 08/29/12 — Eagle Star Minerals Corp., (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company"), is pleased to announce it has oversubscribed and completed its non-brokered private placement of 7,500,000 units at a price of ten cents per unit previously announced August 3rd, 2012.Due to increased demand, the company has oversubscribed by 1,750,000 units for total gross proceeds of $925,000. Closing

Read More

Eagle Star Minerals Arranges $750,000 Private Placement 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 08/03/12 — Eagle Star Minerals Corp. (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") subject to regulatory approval, intends to complete an offering of up to 7,500,000 units at a price of 10 cents per unit for gross proceeds of $750,000 by way of non-brokered private placement. Each unit comprises one common share and one full share purchase warrant. Each full warrant entitles the holder t

Read More

Eagle Star Minerals Receives Excellent Solubility Results of up to 95% at Canabrava 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 08/02/12 — Eagle Star Minerals Corp., (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is very pleased to announce that it has received results from chemical and metallurgical tests of rock types that compose the 15km mineralized package at Canabrava (announced July 5th, 2012). The tests have returned excellent solubility and heavy fraction recovery of results.Solubility tests in both hydro

Read More

Eagle Star Minerals Continues to Receive Assay Results That Confirm Consistency of Phosphate Mineralization at Canabrava and Show Potential for REE 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 07/25/12 — Eagle Star Minerals Corp. (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is pleased to announce that the latest results from composite interval channel sampling continue to confirm consistent mineralization within the previously announced 15 kilometers strike outline at intervals grading from 1.0 to 4.7% P2O5. Complementary analysis of mineralized intervals previously reported

Read More

Eagle Star Minerals Receives Assay Results From Channel Samples of Up to 4.0m at 2.77% P2O5 (incl. 3.0m at 3.17% P2O5) that Confirm the Phosphate Mineralization Over 15 Kilometers at Canabrava 0

VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 07/05/12 — Eagle Star Minerals Corp. (TSX VENTURE: EGE)(PINKSHEETS: ELGSF)(FRANKFURT: E6R) ("Eagle Star" or "the Company") is pleased to announce that composite interval channel sampling results confirm phosphate mineralization within the previously announced 7 meter mineralized package over the 15 kilometers outlined strike area (see press release dated June 21, 2012). Results for an additional eight points are still pending.

Read More