Data logging without limits
SG measurement – compact, dynamic and inexpensive
VANCOUVER, BRITISH COLUMBIA — (Marketwired) — 06/24/13 — Aegean Metals Group Inc. (TSX VENTURE: AGN) ("Aegean" or the "Company") is pleased to announce that it has modified the terms of the private placement financing (the "Private Placement") previously announced (see press release dated April 1, 2013). The revised terms of the Private Placement are: up to 6,200,000 units (the "Units") at a price of $0.10 per Unit for an aggregate subscription price
VANCOUVER, BRITISH COLUMBIA — (Marketwired) — 06/24/13 — Prophecy Coal Corp. ("Prophecy" or the "Company") (TSX: PCY) (OTCQX: PRPCF) (FRANKFURT: 1P2) is pleased to provide the following update of its Ulaan Ovoo mine.Since production was suspended in July, 2012 (see the Company-s August 9, 2012 news release), management has examined all aspects of the Ulaan Ovoo mine, from mining and transportation to marketing and sales, with the goal of lowering production costs and inc
Mobile system with new power controller
VANCOUVER, BRITISH COLUMBIA — (Marketwired) — 06/24/13 — B2Gold Corp. (TSX: BTO)(NYSE MKT: BTG)(NAMIBIAN: B2G) ("B2Gold" or the "Company"), announces that on June 05, 2013 Masbate Operations in the Philippines suspended processing after observing minor leaks in the process plant tailings line. Subsequent wear measurement resulted in the decision to replace the steel line, which has been completed. Production recommenced on June 22, 2013.Prior to this unforeseen event, Ma
Special Q.series modules for the Max Planck Institute
Gantner Instruments introduces itself
Intersected 13.18% Copper, 4.58 g/t Gold and 31.73 g/t Silver Over 5.8 Metres
VANCOUVER, BRITISH COLUMBIA — (Marketwired) — 06/24/13 — Huldra Silver Inc. (TSX VENTURE: HDA) ("Huldra" or the "Company") is pleased to provide an update on mill operations and exploration plans.As part of an effort to reduce costs and increase efficiency, Huldra has temporarily suspended milling operations in Merritt, BC a few days prior to a planned maintenance procedure in order to install previously purchased rubber ball mill liners that will significantly increase