back to homepage

Manufacturing & Production

CORRECTION FROM SOURCE: Goldeye Reports Tyrrell Drill Results Including 33.2 g/t Au Over 1.0 m or 4.0 g/t Au Over 9.0 m in Hole G-11-68 from the Hanging Wall of the Tyrrell Shear Zone 0

TORONTO, ONTARIO — (Marketwire) — 09/14/11 — A correction from source is being issued in respect to the release sent today September 14th, 2011 at 11:34 am ET. The booth number referenced in the second paragraph should be #113 rather than #133. A complete corrected release follows:Goldeye Explorations Limited (TSX VENTURE: GGY) ("Goldeye" or the "Company") is pleased to announce the results from the 12 diamond drill holes completed during the May-June 2011 program on its

Read More

Compact Motion Controller: 0

Nanometer Precision for Multi-Axis Piezo Systems

Read More

Galantas Reports Strategy Focus on Mining and Exploration 0

TORONTO, ONTARIO — (Marketwire) — 09/14/11 — Galantas Gold Corporation (the Company) (TSX VENTURE: GAL)(AIM: GAL), a gold producer and explorer in Northern Ireland, reports today that it will examine joint venture opportunities related to its premium Irish gold jewellery business. The change of strategy permits management to focus on development of the Company as a precious metal producer and explorer, whilst retaining value from past investment in its fine jewellery business.The Company is

Read More

African Gold Group, Inc. Southern Step-Out Hole KBRC11-043 Intercepts 52 Meters at 1.02 g/t Au. Step-Out Drilling Extends Gold Mineralization A Further 600 Meters South of Zone 1 Resource 0

TORONTO, ONTARIO — (Marketwire) — 09/14/11 — African Gold Group, Inc., (TSX VENTURE: AGG)("AGG" or the "Company") is pleased to report the analytical results for 38 near surface (oxide), reverse circulation (RC), step-out drill holes. All 38 step-out drill holes being reported in this release represent step-out drilling to the south of AGG-s Zone 1, 43-101 resources estimate. All southern step-out holes, reported in this release, were collared between section 2700S and s

Read More

TeleCommunication Systems Receives $20.7 Million in Funding From U.S. Army for SNAP Deployable Satellite Systems and Support 0

Funding Continues Expansion of Company-s Efforts to Supply Government With Proven Satellite Solutions

Read More

HELIO-STROB compact 75 – Enhancing image quality and simplifying high performance stroboscopic applications 0

The company Elmed Dr. Ing. Mense GmbH, producer of hiqh performance stroboscopes for industrial use, announces the latest product development of their HELIO-STROB industrial stroboscope series:

Read More

Fast, Cost Effective Piezo Z-Stage for all Major Microscopes 0

The new PI nano piezo-Z stages are optimized for very fast step and settle and easy integration into high-resolution microscope applications. They feature a very low profile a large aperture, and travel ranges of up to 200 µm with sub-nanometer closed-loop resolution–ideal for leading-edge microscopy and imaging applications. The piezo stages are designed for inverted microscopes from the four major manufacturers: Leica, Nikon, Olympus and Zeiss. The low profile design of 20 mm (0.8”) faci

Read More

Fast steps with nanometer precision 0

Something new in microscopy: 1mm objective stage with piezo stepping drives

Read More

Piezo controller with digital linearization 0

PI improves the positioning accuracy for low-cost piezo systems

Read More

AMD Set to Deliver Next Generation x86 Platforms for Windows 8 0

AMD and Microsoft collaborate to enrich computing experience across tablets, notebook and desktop PCs, workstations and servers

Read More