TORONTO, ONTARIO — (Marketwire) — 02/17/12 — Ethiopian Potash Corp. ("EPC" or the "Company") (TSX VENTURE: FED)(TSX VENTURE: FED.WT) reports a compilation of drilling results on its Danakil Project, Ethiopia.The Company has drilled over 6,500 metres in 26 holes; the holes are located in the southwest corner of the property and along the western edge of the Basin covering an area measuring 10 kilometres by 4 kilometres.The following table summarizes assay results which ha
PRINCETON, NJ — (Marketwire) — 02/17/12 — Princeton Security Technologies, Inc. (OTCBB: PSGY), a leading supplier of X-ray and Gamma-ray Detectors, Spectroscopy systems and Radioactive Isotope Identifier Devices (RIID) through its wholly-owned subsidiary Princeton Gamma-Tech Instruments Inc. (PGT), announced preliminary results for the 4th quarter of 2011 ending December 31, 2011.PSGY expects to report revenue of approximately $1.3 million for the fourth quarter of fiscal year 2011, which r
TORONTO, ONTARIO — (Marketwire) — 02/17/12 — Red Crescent Resources Limited ("RCR") (TSX: RCB)(FRANKFURT: 7RC), a mineral exploration and development company focused on base metals in Turkey, today announced that following a full review by the board, it has approved the Company-s specific business targets established for 2012 project operations."Our project teams defined an operating budget inclusive of contingency amounting to $3.5 million as sufficient to carry RCR to a pos
VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 02/17/12 — Rio Alto Mining Limited ("Rio Alto" or the "Company") (TSX VENTURE: RIO)(OTCQX: RIOAF)(LMA: RIO)(DBFrankfurt: MS2) is pleased to announce that the updated Technical Report referred to in the Company-s news release of January 5, 2012 in respect of updated mineral resource estimates for the Company-s La Arena Project located in north central Peru has been completed. A copy of this Technical Report is available under t
12 – Pactron, a preeminent supplier of board level design and contract manufacturing solutions to the semiconductor industry, has recently purchased an Aegis Manufacturing Operation Software (MOS) system to improve efficiency across their facility. This system comprises Aegis- iLaunch, iView, iTrac, IQ and XLink software modules. Pactron turned to Aegis after enjoying excellent technical support related to a previous purchase, and their decision was further simplified when they realized that Aeg
VANCOUVER, BRITISH COLUMBIA — (Marketwire) — 02/17/12 — NovaGold Resources Inc. (TSX: NG)(NYSE Amex: NG) ("NovaGold" or "the Company") announced an amended time for its conference call. The conference call will still be held on February 23 as previously announced, however the starting time for the call has been amended to 8.30 am PST (11.30 am EST); it will also be carried on the Company-s website.NovaGold will host a conference call and webcastThursday, February 23 at 8
TORONTO, ONTARIO — (Marketwire) — 02/17/12 — Carlisle Goldfields Limited (TSX: CGJ) (the "Company" or "Carlisle") announces further assay results from the MacLellan Mine Project in Northwest Manitoba near the Town of Lynn Lake where the Company has completed a 45,000 metre diamond drilling program. The results from the drill program address 3 areas: (1) the MacLellan Mine, (2) the Western Extension and (3) the Bruichladdie Zone (please see the maps below).The Company pu
LONDON, ONTARIO — (Marketwire) — 02/17/12 — iLOOKABOUT Corp. (TSX VENTURE: ILA) ("iLOOKABOUT" or "the Company") announced today that, subject to the approval of the TSX Venture Exchange ("TSXV"), the Company intends to complete a private placement of Series 1 Preference Shares at a subscription price of $1.00 per share, with a minimum offering of $500,000 and a maximum offering of $750,000 (the "Offering"). The Offering is scheduled to close in escrow
The Energy Department at the AIT Austrian Institute of Technology is hard at work developing solutions for the energy supply of tomorrow. This work includes designing automation concepts for distributing power intelligently in so-called smart grids so that renewable forms of energy can be deployed on a massive scale. Because this involves the integration of distributed systems with a heterogeneous hardware structure, strategies for deploying ICT-based energy systems more often than not
TORONTO, ONTARIO — (Marketwire) — 02/17/12 — Orvana Minerals Corp. (TSX: ORV) ("The Company"), through its wholly-owned subsidiary, Orvana Resources US Corp ("Orvana USA"), is pleased to report the receipt of the draft mining permit for the Copperwood copper project from the Michigan Department of Environmental Quality ("MDEQ") as prescribed in Part 632 of the Michigan Nonferrous Metallic Mining regulation.Jim Jacques, VP Operations of the Company and General M